IFC Model Data in Excel: Using Copilot for IFC to Track Construction Progress
The Progress Reporting Problem in Construction
Construction projects track hundreds or thousands of individual work packages across multiple floors, trades, and delivery phases. The data that would let a site manager, BIM coordinator, or project controller answer “what has been installed on floor 1 this week?” typically lives in two disconnected places: the BIM model — which contains every element, its type, its storey, and its properties — and a separate spreadsheet or site diary, which has status updates but no reliable link back to model elements.